We've been dreading yesterday for weeks because of an anticipated 4 or 5 hour walk through to choose all of our electrical outlets, phone outlets, cable outlets and light switches. Our cabinet guy was also there to draw out where every cabinet is going to be.
It actually wasn't nearly as bad as we thought.
I don't know how much it actually helped, but I had blown up copies of individual rooms, and marked off where I thought all of our lights, switches, outlets, etc should be. Sara and I had a little Tiedeman Staff Meeting the nights before the walk through to discuss the drawings. A certain number of outlets and switches are code (local or state, I'm not sure), and a certain number of outlets and the rest were agreed to in advance in our spec book. For anything beyond code and spec, of course there is an additional cost. This process includes recessed lights by the way, which we really like but which are not all that cheap. We were able to negotiate an increase in the number of recessed lights before we signed the purchase agreement, but we anticipated going way over anyway.
We were given advice by Nate to have them lay out the code and spec first, so that if possible we could move those around rather than automatically adding in areas we needed outlets or switches. That was great advice, and probably saved us some money.
Justin brought a heater, which helped a lot. While there is no insulation, with the windows taking in the sunlight, and the heater fired up, it could have been a lot worse.
The whole process took about 3 hours.
The biggest "issue" we had was we realized there was a downside to the clever master bath vanity that we had designed in that while it was great for Sara to do her hair and makeup in the morning, we lost a lot of drawer space for all the stuff you want to be right at the sink when you are getting ready. We're working on some potential fixes to that issue, and hope not to lose the design of the vanity.
My prep worked ended up being pretty close to where they placed the code and spec outlets. We did move a few around, but didn't end up having to add all that many. We were far more aggressive inside with recessed lights than I had been, but I hadn't included all that we had in our spec book. We went over a few, but not nearly as many as we had anticipated. And where we added them, I think we're really going to be happy. Our kitchen is full of recessed lights and pendants over the island. It is going to be very cool.
The electrician was happy with us that we had anticipated in advance how we wanted our ceiling fans to operate, dim, etc. We purchased a reasonably inexpensive switch at Home Depot, and he's going to install them for us. He said normally he installs regular light switches, only to have customers show up at the end expecting dimmers and dials. I think he was shocked that we were prepared for that.
We certainly went over, but because we only added one phone line rather than 5 (I haven't had a landline in 6 years), and I think we have fewer cable hookups than spec (we're moving close to wireless, not further technologically), and both of those downgrades will help significantly to defray the additional cost of the upgrades.
All in all, it was a painless process, and I think we are going to be very happy with how our lights and all of the electrical stuff will work.
Our cabinet guy is in the process of designing the cabinets after yesterday, and will have a 3D rendition online for us to play around with in a week or so. From there, we'll add, resize and move doors and drawers to get our kitchen, bathroom and laundry room cabinets the way we want.
More later. . .